Toroidal windings built to your drawing

We build toroidal transformers, autotransformers and inductors in Carate Brianza, Italy. One piece for the prototype, a few thousand for the run, always with the same testing.

ODIDH

Useful numbers before you write to us

5 VALowest rating we handle economically
3000 VAHighest rating on a single core
5 daysTypical lead time for the first sample
100 %Parts put through electrical testing

A workshop, not a catalogue

Toroidal Winding is a winding shop in Carate Brianza, in the middle of the Brianza district that has been building machines for sixty years. The person who answers the phone is the person who winds the part.

That changes two things. A doubt about the drawing gets settled in one call instead of three emails. And the awkward part, the one nobody wants because only twenty are needed, gets made here.

About us

Enamelled copper wire wound onto a toroidal core
Enamelled copper wire laid in tight turns on the core

How a part comes together

Five steps, in the order they actually happen. The first and the last we do with you, the three in between stay in the workshop.

01

Specification

You send voltages, rating, maximum envelope and insulation class. If all you have is the old part to replace, that works too: we measure it here.

02

Calculation

We size the core, the turns count, the wire gauge and the layer build. You get back real rating, no load losses, estimated temperature rise and finished dimensions.

03

Winding

The wire is laid onto the closed core on a shuttle winder. Primary, shield if requested, then the secondaries, with insulating tape between layers.

04

Finishing

Impregnation, flying leads or faston terminations, part marking, potting or a containment cup where the application calls for it.

05

Testing and delivery

Electrical tests part by part, test report on request, packing and shipping. The batch number stays traceable.

No part leaves without being powered up

Testing is not a separate service. It is the reason a toroidal transformer built here reaches the line and stays there.

How we test

  • Dielectric strength between primary, secondaries and core
  • Insulation resistance under direct voltage
  • Turns ratio and open circuit voltage on every secondary
  • No load current and inrush peak check
  • Continuity and ohmic resistance of each winding
  • Thermal test on the production sample under load

You have a drawing, an old part or just a voltage to reach

Send us what you have. If a figure is missing we will ask, and you get a quotation within two working days.

2 daysResponse time
1 pieceMinimum quantity
SubcontractAlso on your cores
Request a quote